Different events can lead to a reduction of data availability. Among these, the most common events are the following:

  • A change in the altimeter constellation: either the loss or the introduction of an additional altimeter in the constellation directly impacts the number of altimeter measurements available.
  • For a specific platform, a reduction in the number of altimeter measurements available as inputs of the DUACS system processing. This can be linked to an anomaly onboard the platform or on the ground segment, preventing the data reception and impacting the L0 to L2 processing. It can also be induced by an degraded aquisition of the DUACS system that can be induced by missing upstream products and/or auxiliaries (e.g : various geophysical correction specificaly updated at L3)
  • An increase of invalid measurements used as inputs of the DUACS system processing. This is usually linked to specific platform events (e.g., manoeuvres), but can also be induced by L0-L2 processing anomalies or specificities. In some rare cases, degraded acquisition by the DUACS system can also lead to an bad data selection.
  • An anomaly of the L3/L4 processing

We list in the folowing table the main events impacting the quality and availability of the NRT L3/L4 products.

Table 1 :  Main constellation events impacting the NRT data availability

DatePlatformEvent
2020/01/31-2020/02/13J3The mission entered in safe hold mode.
The Sentinel-3A mission is used as temporary anchor mission for cross-calibration processing from 2020/02/06 to 2020/03/03
2020/06/15-2020/06/23J3The mission entered in safe hold mode
2020-07-07HY-2BHY-2B is introduced in DUACS NRT processing
2020/11/30-2020/12/04HY-2BNo upstream measurement available
2021/08/16-2021/08/17HY-2BNo upstream measurement available
2020/07/15-2020/10/29C2The processing of the C2 mission was inhibited, time to manage an orbit change for this mission
2022-04-06S6ASentinel6A (HR measurement) is introduced in DUACS NRT processing
2022/04/06 – 2022/05/24J3The processing of the mission was inhibited, time to manage an orbit change for this mission
2022/10/09-2022/10/11HY-2BNo upstream measurement available
2022-10-11ALNo L3 measurement available
2022/11/17-2022/12/02S6AVarious sections of tracks are missing in upstream products.
2022/12/30- 2023/01/08AL
2023/04/30-2023/05/05S3A & S3BData available with few days delay due to missing L0 inputs from the Marine PDGS (Payload Data Ground Segment)
2023/0731-2023/08/05H2BData unavailability due to satellite manoeuvre
2023-11-30SWONSWOT-nadir is introduced in DUACS NRT processing
2024/05/11-2024/05/17H2BData unavailability
2024/12/18-2025/01/25H2BData invalidity : no valid data available for L3 processing
2024/01/07-2025/05/xxJ3Jason-3 moved on a tandem orbit with Sentinel-6A. During this period, Jason-3 measurements are not processed in L3
2025/05/xxJ3Jason-3 moved on a interleaved long repeat orbit. L3 products are delivered in the new “j3g” dataset

Table 2:  Main events affecting the data availability in NRT conditions