DUACS NRT system impacting version changes

Table : Overview of the main improvements implemented in the NRT 1 Hz and 5Hz processing

Date of change DUACS version Psoting-rate  Description of the change
Apr-2017 17.0 1Hz Sentinel-3A introduced in DUACS processing
Oct-2017 17.1 1Hz OSTM/Jason-2 Long Repeat Orbit introduced in DUACS processing
Mar-2018 18.0 1Hz New Mean Profile for Jason-3 and updated mapping parameters
Sep-2018 18.1 1Hz New Orbit Standards for Jason-3
Sep-2018 18.2 1Hz New upstream products for Cryosat-2
Apr-2019 18.4 1Hz Sentinel-3B introduced in DUACS processing

Use of new Sentinel-3A Hybrid Mean Profile

New Europe L4 product

Dec-2019 18.4.2 1Hz New MDT used for Global and regional Processing
Jan-2020 1Hz SARAL/AltiKa new GDR-F standard
Jul-2020 18.4.5 1Hz HY-2B introduced in DUACS processing

Use up-to-date standards for Ocean and Pole tide correction

Oct-2020 18.7.0 1Hz Jason-3 GDR-F standards change

Use a new MDT for regional Europe production

May-2021 18.7.1 1Hz Use a new MDT for regional Europe production
Dec-2021 19.0.0 1Hz DT-2021 standards uniformization:

–          Use new Internal-tide correction

–          New MSS and Mean profiles

–          New MDT

–          Use improved mapping parameters

–          Improved LWE correction

–          NetCDF format change

Apr-2022 19.1.0 1Hz Sentinel-6A introduced & Jason-3 deactivated in DUACS processing
May-2022 19.2.0 1Hz Jason-3 on its new interleaved orbit reintroduced in DUACS processing
Nov 2022 1.0.0 5Hz Start of the L3 5 Hz production over the Europe area (new DUACS-NG system used)
Nov-2023 1Hz The L3 1Hz production shifted on a new system (DUACS-NG), used full-rate 20Hz upstream when available (same system as for L3 5Hz production)
Nov 2023 2.0.0 5Hz §  Start of the L3 5 Hz production over the Global Ocean

§  Ensure the L3 1Hz production using full-rate 20Hz upstream when available

Use SWOT-Nadir measurements

Jul-2024 3.0.0 1Hz & 5Hz Change of the altimeter standards: Ocean tide and MSS
Nov 2024 4.0.0 1Hz & 5Hz

L4

Change of the mapping method

change of the formal mapping error estimation; change of the geostrophic current method; change of the L4 product grid; change of the MDT

More details on the dedicated pages by clicking on the date in the table.